Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | Yes |
Still deciding? Get samples of US$ 2259/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Deye Solar Energy Products MPPT Hybrid Inverter 120V 8kw 10kw 12kw 15kw
Model
|
SUN-8K-SG04LP3
|
SUN-10K-SG04LP3
|
SUN-12K-SG04LP3
|
|
Battery Input Data
|
||||
Battery Type
|
Lead-acid or Li-lon
|
|||
Battery Voltage Range (V)
|
40~60V
|
|||
Max. Charging Current (A)
|
190A
|
210A
|
240A
|
|
Max. Discharging Current (A)
|
190A
|
210A
|
240A
|
|
Charging Curve
|
3 Stages / Equalization
|
|||
External Temperature Sensor
|
Optional
|
|||
Charging Strategy for Li-Ion Battery
|
Self-adaption to BMS
|
|||
PV String Input Data
|
||||
Max. DC Input Power (W)
|
10400W
|
13000W
|
15600W
|
|
PV Input Voltage (V)
|
550V (150V~800V)
|
|||
MPPT Range (V)
|
200V-650V
|
|||
Start-up Voltage (V)
|
160V
|
|||
PV Input Current (A)
|
13A+13A
|
26A+13A
|
26A+13A
|
|
No.of MPPT Trackers
|
2
|
|||
No.of MPPT Trackers
|
1+1
|
2+1
|
2+1
|
|
AC Output Data
|
||||
Rated AC Output and UPS Power (W)
|
8000W
|
10000W
|
12000W
|
|
Max. AC Output Power (W)
|
8800W
|
11000W
|
12000W
|
|
Peak Power (off grid)
|
2 times of rated power, 10 S
|
|||
AC Output Rated Current (A)
|
12A
|
15A
|
18A
|
|
Max. AC Current (A)
|
18A
|
23A
|
27A
|
|
Max. Continuous AC Passthrough (A)
|
50A
|
|||
Output Frequency and Voltage
|
50/60Hz; 230/400Vac (Three phase)
|
|||
Grid Type
|
Current Harmonic Distortion
|
|||
Current Harmonic Distortion
|
THD<3% (Linear load<1.5%)
|
|||
Efficiency
|
||||
Max. Efficiency
|
97.60%
|
|||
Euro Efficiency
|
97.00%
|
|||
MPPT Efficiency
|
99.90%
|
|||
Protection
|
||||
PV Input Lightning Protection
|
Integrated
|
|||
Anti-islanding Protection
|
Integrated
|
|||
PV String Input Reverse Polarity Protection
|
Integrated
|
|||
Insulation Resistor Detection
|
Integrated
|
|||
Residual Current Monitoring Unit
|
Integrated
|
|||
Output Over Current Protection
|
Integrated
|
|||
Output Shorted Protection
|
Integrated
|
|||
Output Over Voltage Protection
|
Integrated
|
|||
Surge protection
|
DC Type II / AC Type II
|
|||
Certififications and Standards
|
||||
Grid Regulation
|
IEC61727, IEC62116, IEC60068, IEC61683, NRS 097-2-1
|
|||
Safety EMC / Standard
|
IEC62109-1/-2, IEC61000-6-1, IEC61000-6-3, IEC61000-3-11, IEC61000-3-12
|
|||
General Data
|
||||
Operating Temperature Range (ºC )
|
-25~60ºC , >45ºC Derating
|
|||
Cooling
|
Smart cooling
|
|||
Noise (dB)
|
<30 dB
|
|||
Communication with BMS
|
Communication with BMS
|
|||
Weight (kg)
|
36.8
|
|||
Size (mm)
|
422W×658H×281D
|
|||
Protection Degree
|
IP65
|
|||
Installation Style
|
Wall-mounted
|
|||
Warranty
|
5 years
|
ANHUI GP NEW ENERGY CO., LTD
We, Anhui GP New Energy Co., Ltd (Great Pack) focus on LiFePO4 rechargeable batteries, solar energy system and solar PV module, are the leading solar energy solution supplier in China, who committed to the R&D, design, and innovation of solar energy devices to supply Green & Clean energy to our daily modern lives!
Our team has over 10 years of experience in the solar panel energy field and supplies One Stop Power Solution to help you save time & capital and achieve advanced technologies and excellent OEM/ODM service.
Quality is life, Great Pack is committed to supplying high-quality solar solution products and the best service to our clients worldwide. Our product has passed TUV, CE, UN38.3, RoHS, and MSDS etc certificates. We are committed to becoming a leading solution provider to go global in the Solar energy solution industry.
Q1: Can the product be shipped to my area?
A1: We export to most countries/regions (Centre/South America, EMEA, SEA, SSA, AU). We will check and confirm for you after you provide the region.
Q2: What about the lead time?
A2: 10 Working days for 200kw requirements.
Q3: How can I make a payment?
A3: 100% TT, or we can accept 30% TT in advance and 70% TT upon goods being ready before shipment.